microsoft / powerbi-visuals-gantt

A Gantt chart is a type of bar chart which illustrates a project timeline or schedule. The Gantt Chart visual shows the Tasks, Start Dates, Durations, % Complete, and Resources for a project. The Gantt Chart visual can be used to show current schedule status using percent-complete shadings and a vertical "TODAY" line. The Legend may be used to group or filter tasks based upon data values.

Summary
email_034-attachment-send-file-code-cssCreated with Sketch.
Main Code: 3,210 LOC (11 files) = TS (97%) + LESS (1%) + YML (<1%)
Secondary code: Test: 2,108 LOC (4); Generated: 12,753 LOC (1); Build & Deploy: 58 LOC (1); Other: 14,023 LOC (10);
Artboard 48 Duplication: 1%
File Size: 76% long (>1000 LOC), 23% short (<= 200 LOC)
Unit Size: 22% long (>100 LOC), 22% short (<= 10 LOC)
Conditional Complexity: 10% complex (McCabe index > 50), 35% simple (McCabe index <= 5)
Logical Component Decomposition: primary (3 components)
files_time

5 years, 1 month old

  • 100% of code older than 365 days
  • 100% of code not updated in the past 365 days

76% of code updated more than 50 times

Also see temporal dependencies for files frequently changed in same commits.

Goals: Keep the system simple and easy to change (4)
Straight_Line
Features of interest:
TODOs
2 files
Commits Trend

Latest commit date: 2020-02-25

0
commits
(30 days)
0
contributors
(30 days)
Commits

1

9

20

46

17

Contributors

1

3

7

9

3

2020 2019 2018 2017 2016
show commits trend per language
Reports
Analysis Report
Trend
Analysis Report
76_startup_sticky_notes
Notes & Findings
Links

generated by sokrates.dev (configuration) on 2022-01-30